Project Area

- 3,220 rai (2,561.99 acres)

- General Industrial Zone: 2,591 rai 2 (approx. 1,024.36 acres)

- Residential/Commercial area: 12 rai (4.74 acres)

- Green area and buffer zone: 335 rai (approx. 132.44 acres)

- Infrastructure and public utilities: 282 (approx. 111.48 acres)

Distance from locations

- Don Muang Airport: 190 kilometers

- Suvarnabhumi International Airport: 150 kilometers

- Chon Buri: 110 kilometers

- Pattaya: 45 kilometers

- Rayong: 25 kilometers

Price for sale / rent

-General Industrial Zone: 10 million Baht/rai

Location Details

9 Moo 2, Banchang, Rayong 21103

Industrial Estate Office

9 Moo 2, Banchang, Rayong 21103

Tel:66-3868-9123-5

Fax:66-3868-9092

E-Mail : asiaindustrial_r@yahoo.com

Sales Office

49 Asia Sermkit Tower, Soi Pipat, Silom Road Bangrak, Bangkok 10500

Tel:66-2231-5800

Fax:66-2231-5933

E-Mail: asiaie2004@yahoo.com

Service Rates

Maintenance Fee

-1,125 Baht/rai/month

Water Tariff

- 12.8412 Baht/cubic meter for raw water

- 21.00 Baht/cubic meter for piped water, depending on the rate specified by the Provincial Waterworks Authority (10-21 Baht/cubic meter)

Electricity Fee

- Charged according to the rate specified by the Provincial Electricity Authority

Telephone Fee

- Charged according to the rate specified by TOT Public Company Limited

Convenient

Water supply system

Water Supply System

-  Raw Water Supply : The average supply on an annual basis of 40.0 cu.m./rai/day.

Road system

- Primary roads: Reinforced Concrete Road, with dual carriage ways with 2×9.5 meters width (ASSHTO Standard) and a right of way of 44 meters.

- Secondary roads: Reinforced Concrete Road, with single carriage way with 14 meters width (ASSHTO Standard) and a right of way of 30 meters.

Wastewater treatment system

 Pre-treatment by Buyer, Final treatment by AIEMTP’s central wastewater treatment plant (Activated sludge)

 

Flood protection system

 Reinforced concrete U-ditch along the road