Rojana Industrial Estate Laem Chabang Chonburi Province

Year of Establishment: 2015

Developer: Rojana Industrial Park Public Company LimitedCo., Ltd.

Website: www.rojana.com

Rojana Industrial Estate Laem Chabang Chonburi Province

Location

Rojana Industrial Estate Laem Chabang Chonburi Province

Project Area
  • Total area : 943.36 rai (1,509,376 square meters)
  • Industrial area : 698.89 rai (1,118,224 square meters)
  • Utilities area : 145.04 rai (232,064 square meters)
  • Green area and Buffer zone : 43 rai (159,088 square meters)

Distance from locations
  • From Rojana Laem Chabang Industrial Estate to Laem Chabang Port : approximately 8
  • From Rojana Laem Chabang Industrial Estate to J-Park Sri Racha : approximately 14
  • From Rojana Laem Chabang Industrial Estate to Laem Chabang Hospital : approximately 15
  • From Rojana Laem Chabang Industrial Estate to Pattaya City : approximately 27
Price for sale / rent

General industrial zone : million THB/rai (4,687.50 THB/square meter)

Location Details
  • Rojana Laem Chabang Industrial Estate’s Office

No.669 Takhian Tia Sub-district, Bang Lamung District, Chonburi Province, 20150, Thailand

  • Rojana’s Bangkok Head Office

2034/115, 26th Floor, Italthai Tower, New Phetchaburi Road, Bangkapi Sub-district, Huaykwang District, Bangkok 10310, Thailand

Convenient

Water supply system

  • Industrial water production system designed with a capacity of 3,000 cubic meters/day.
  • The project receives raw water from Eastwater Group’s and has a reserve water source with support from the Provincial Waterworks Authority of Thailand, Pattaya Branch.

Road system

Main Line and Side Line : Reinforced concrete ROW 30 meters, overall traffic surface 14.0 meters, 4 traffic lanes and 3.0 meters wide shoulder/bicycle lane on each side.

Wastewater treatment system

  • An activated sludge treatment system.
  • Able to handle wastewater with a capacity of 2,700 cubic meters/day.

Flood protection system

  • Drainage of rainwater in the project is U-shaped reinforced concrete drainage by gutter placed along on sides of the road in the gravity flow.
  • The project’s drainage system is designed with reference to calculating the amount of water flow using Rational Method.
  • Rainwater drainage is designed follow the gravity flow system.
Other

Electrical system

  • The Provincial Electricity Authority will construct the substation and install light poles and wiring high voltage 115 kV into the substation within the project, and adjust the voltage to 22 kV before supplying to industrial plants located in the project area.

 Telephone system and Internet system

  • High quality internet fiber optic network.
  • Service rates as announced by various service providers.